The contractor has opened Highway 7 for thru traffic. However, the traffic light at the intersection of Northwestern Dr. and Highway 7 is not installed. The contractor is waiting for the traffic light to be shipped and then will install the light.
During the time there will not be a traffic light at the intersection, there will be a 4-way stop sign at the intersection. Citizens are advised to use caution at this intersection.
The timeline for the traffic light installation is estimated to be within three weeks.
The City of Storm Lake wants to thank the citizens for their patience during construction.
No comments:
Post a Comment